What the bundle count tells a supervisor
Work in progress is often treated as a storage problem. On a sewing line it is the earliest warning that the line is out of balance.
By the BunonBrain team · · 4 min read
Some WIP is necessary: each operator needs work waiting so they never sit idle. Too much WIP means money tied up in half-made garments, longer throughput times and quality problems discovered late.
Three patterns to look for
- Growing pile in front of one station. That station is the bottleneck. Act within the hour.
- Empty stations after a pile. The line downstream is starved and losing minutes.
- WIP rising everywhere. Input is faster than the line can absorb; slow the feed or check the plan.
Turning WIP into a routine
Agree a healthy range of bundles per station, check it at fixed times in each shift, and record what was done when a station falls outside it. Over time, those records show which operations need permanent attention.